How can I ensure quality using Snagstream?

Within Snagstream we offer a number of standard forms that help you comply with the WKB. This way you can get started right away!

To ensure that you meet the requirements of the new Quality Assurance Act (WKB), it is useful to complete additional quality rounds. We have prepared the following forms for you that you can load directly into your Snagstream environment, which will help you ensure quality. This way you can get to work straight away.

10 asbestos removal WKB 
10 Demolition and shoring work WKB
12 Dewatering WKB
12 Groundwork WKB
14 Gawalo and utilities below standard WKB
15 Terrain hardening WKB
20 Mortar screw piles WKB
20 Prefab piles - pile driving WKB
21 Poured ground floor floors WKB
21 Concrete foundation poured in situ WKB
21 Basement walls cast in situ WKB
21 Monolithic finished concrete floors WKB 
21 Reinforcement WKB
22 Gibo / aerated concrete inner walls WKB
22 Sand-lime brick walls WKB
22 Masonry WKB
22 Jointing WKB
23 Wide slab floors WKB
23 Hollow core slab floors WKB
23 Small prefab WKB
23 Prefab concrete galleries + balconies WKB
23 Prefab foundation with drilled piles WKB
23 Prefab foundation on steel WKB
23 Prefab walls WKB
23 Rib cassette floors WKB
24 WKB HSB walls
24 WKB hinge caps
25 Steel constructions WKB
30 Aluminum facade frames WKB
30 Hinges and locks WKB
30 Wooden facade frames / adjustable frame WKB
30 Plastic facade frames WKB
31 Aluminum, steel or zinc facades / roofs WKB
32 WKB fencing and balustrades
32 WKB wooden stairs
32 WKB steel stairs
33 Bituminous roofing WKB
33 Plastic roof covering WKB
33 Slate roofs WKB
33 Tile roofs WKB
33 Thatched roofs WKB
34 Glazing WKB
35 Natural stone facade WKB
35 Natural stone floors WKB
36 Kit work WKB
36 Joint fillings airtight WKB
40 Stucco within WKB
41 Wall and floor tiles WKB
42 Anhydrite floors WKB
42 Sand cement screeds WKB
44 Metal stud ceilings WKB
44 Metal stud walls WKB
44 System ceilings WKB
46 Painting on existing work WKB
46 Painting on glass fiber wallpaper WKB
46 Painting on new work WKB
46 Painting on stony surfaces WKB
50 Gutters and rainwater drains WKB
50 Gutters and overhangs plastic WKB
51 Indoor sewer system WKB
52 Water installation WKB
53 Sanitary WKB
54 fire-resistant facilities WKB 
55 Gas installations WKB
60 Heating installations WKB
61 Mechanical ventilation WKB
70 Electricity WKB
70 Lighting WKB
80 Lifts WKB
Checklist Workplace Inspection
Process Report of Completion Housing Deposit